Gaylord Pacific Hotel

Gaylord Pacific Hotel

Location: Chula Vista, CA
Client: RIDA Development
Completion Date: 2025

Awards
2026 "Project of The Year" - ASCE
2025 "Honor Award" - APWA
2025 "Merit Award" - ACEC

Project Summary

The Gaylord Pacific Resort Hotel and Convention Center includes a 1,600 room 22 story hotel with a 600,000 sf convention center with four ballrooms, outdoor meeting areas and event lawns; public promenades and public amenities, all situated on a 36.7 acre parcel on the Chula Vista Bayfront.

Nasland Engineering provided all civil engineering and surveying services for the project including on site grading, utilities, and paving for the hotel and convention center. Our team envisioned and is executing the complicated utility relocation phasing and scheduling which will allow for the critical path construction of the hotel foundation and tower while maintaining services to adjacent existing Port tenants and providing utility capacity for the full build out of the Chula Vista Bayfront.

Nasland’s team prepared all the public infrastructure design and technical documents for the utility relocations, site demolition, phasing, interim access, and the grading of the H 3 parcel accounting for sea level rise. A completed new roadway infrastructure with two roundabouts and public promenades wraps the hotel parcel with new public utility infrastructure sized for full build out of the Chula Vista Bayfront area. Drainage improvements include on site and off site water quality treatment design and three new storm drain outfalls to San Diego Bay. Bikeway improvements included a separate bikeway on the south side of H Street and the extension of the Sweetwater Bikeway along E Street to connect to Bayside Park.

Soft Landing

Soft Landing

Location: Boise, ID
Client: Studio H Architects
Contractor: DK Constructors
Completion Date: 2025

Project Summary

The Soft Landing Ice Cream Shop brings an elevated soft serve ice cream experience to the Boise community by proudly serving all-natural soft serve and sundaes free from artificial flavors, colors, and high fructose corn syrup. The project included tenant improvements to transform the existing 1937 commercial flower shop building into a vibrant family-friendly ice cream shop. Site improvements included replacement of the existing damaged pavement and installing new drainage improvements, stormwater management facilities, curb, sidewalk, and a new ADA pedestrian ramp to the building. Nasland Engineering provided civil engineering design for the project.

PORTFOLIO

West End Eight Condominiums

West End Eight Condominiums

Location: Boise, ID
Client: Trig Point Capital, LLC
Contractor: Perryman Construction Management
Completion Date: 2024

Project Summary

The West End Eight Condominiums project provide sleek and contemporary housing to the West End/Veteran’s Park neighborhood of Boise. This project includes eight condominium units in two separate buildings with a shared driveway off the adjacent public street. Site Improvements included site grading and drainage, utility connections, stormwater retention, and street frontage improvements. Nasland Engineering provided civil engineering design for the project.